Construction

The construction of a project is like the development of a life.

In the process of each project, many anticipated and unanticipated events will occur. The quality of construction and the implementation of construction safety are the most difficult areas.

The project will have the construction sequence and time control, and Sunshine Energy will provide customization according to each customer needs.

 

Control Points

1. Pressure and flow direction of air in the project: the flow direction and pressure of the positive pressure project and the negative pressure project will affect the amount of bacteria

2. Combination of clean room compartment and freezer: how to open the holes, the thermal insulation coefficient of the material, the residue of the floor, the dryness and the slip resistance, and the permanent usability are all key factors.

3.Division of water supply and drainage: drinking water, clean water, hot water, cold water, different pipelines are required.

4. Air filtration reduces maintenance and cleaning operation costs: the temperature and humidity in the air, the heat generated during the operation, how to ventilate, and how to increase the oxygen content.